Thebangladaily
Fast mobile article powered by Nexiamath-SEO AMP.
AMP Article

Dhaka-Cox’s Bazer: Mahanagar Express to run from Monday

Published October 24, 2026 · Updated October 24, 2026 · By Sandra Anderson - thebangladaily.com

Foto : Sandra Anderson - thebangladaily.com

Mahanagar Express Set to Link Dhaka With Cox’s Bazar From October 26

Thebangladaily.com – Passengers travelling from Dhaka and a series of important stations along the eastern rail corridor will soon have a new direct option for reaching Cox’s Bazar. The intercity Mahanagar Express is scheduled to begin operating on the extended Dhaka-Cox’s Bazar route from Monday, October 26, expanding beyond its established Dhaka-Chittagong service.

The first journey on the new route is due to leave Kamalapur Railway Station in Dhaka at 8:30pm. Railway Minister Sheikh Rabiul Alam is expected to inaugurate the maiden Cox’s Bazar-bound service at the capital’s main railway terminal.

For travellers, the change is significant because the Mahanagar Express will make stops at intermediate stations that previously did not have direct rail access to Cox’s Bazar. The service is expected to provide a practical new connection for passengers heading to the country’s best-known beach destination.

New overnight timetable

Under the revised schedule, the train will depart Dhaka at 8:30pm and arrive in Chittagong at 3:00am. It will then leave Chittagong for Cox’s Bazar at 3:20am, with arrival at the coastal destination planned for 6:00am the following morning.

The return journey will begin from Cox’s Bazar at 8:00am. The train is scheduled to reach Chittagong at 12:20pm before continuing to Dhaka, where it is expected to arrive at 6:30pm.

The weekly off-day for the Dhaka-Cox’s Bazar Mahanagar Express service will be Sunday. Ticket sales for the extended route began on October 16, allowing prospective passengers to make plans ahead of the first departure.

Direct access for stations on the route

The extended service will serve passengers at Dhaka Airport, Narsingdi, Bhairab Bazar, Ashuganj, Brahmanbaria, Akhaura, Kasba, Comilla, Laksam, Nangalkot and Feni. Residents of these areas will be able to travel by train to Cox’s Bazar without needing to change to another service after reaching Chittagong.

This is a notable departure from the arrangement faced by many travellers in these districts. The Cox’s Bazar Express and Paryatan Express had operated as non-stop services, leaving people at intermediate stations without a direct rail journey to the resort town. The Mahanagar Express extension is designed to fill that gap while retaining the route’s connection with Chittagong.

Dhaka Airport station may be particularly useful for passengers who can access the rail network from the airport area rather than travelling into central Dhaka first. Likewise, the stops through Narsingdi, Bhairab Bazar, Brahmanbaria, Comilla and Feni place a larger stretch of the eastern region within reach of a single Cox’s Bazar-bound train.

Capacity and tourism implications

The train will operate with 16 coaches and will have seating for between 706 and 736 passengers. That capacity creates room for a substantial number of travellers on each journey, while the overnight Dhaka departure and early-morning arrival could appeal to visitors seeking to begin their time in Cox’s Bazar soon after reaching the destination.

Cox’s Bazar is home to the world’s longest unbroken sea beach, and rail authorities expect the additional service to encourage more tourist travel. A direct connection can also make the destination more accessible for families, groups and passengers who prefer scheduled train travel to a long road journey.

The route expansion is also anticipated to support railway revenue. More boarding points mean the service can draw passengers from a broader area, rather than serving only those able to join the journey in Dhaka or Chittagong. The combination of tourism demand and access from intermediate stations gives the train a wider role than a simple extension of its former route.

Preparations completed for launch

Chittagong Railway Station Manager Abu Bakkar Siddique said preparations for operating the new Dhaka-Cox’s Bazar service have been completed. The launch will mark the beginning of a regular route arrangement intended to connect the capital, Chittagong and Cox’s Bazar through one intercity train service.

Passengers planning to use the Mahanagar Express should keep the Sunday weekly closure in mind and check ticket availability before travel. With the route now set to include both major cities and numerous stations in between, the service offers an additional rail choice for people travelling toward Cox’s Bazar from across the eastern corridor.

Related Reading

Frequently Asked Questions

What is Dhaka Cox s Bazer?

Dhaka Cox s Bazer is the main topic of this guide. The article explains the context, practical details, and next steps readers should understand.

Why does Dhaka Cox s Bazer matter?

Dhaka Cox s Bazer matters because readers are looking for a useful answer, not just a short summary. Good content should match search intent and help them decide what to do next.